How Long Does Modular Kitchen Installation Take?
From design approval to handover, here is what happens at each stage and what can cause delays.
A standard modular kitchen takes 30 to 45 days from consultation to handover, depending on the size, complexity, and material availability. Installation on site is only one part of that time.
The stages are: consultation and site measurement, design and 3D approval, manufacturing, delivery, installation, and finishing with handover.
Most of the time goes into design approval and manufacturing. Once the units reach your home, fitting them is much quicker than building a kitchen from scratch.
Delays usually come from three sources. Changes after the design is approved, civil or plumbing work that is not ready when the units arrive, and specific materials that must be ordered.
You can help keep things on schedule by finalising your choices early, completing tiling, plumbing, and electrical points before installation day, and keeping the site accessible.
We share a clear timeline at the start so you can plan around it.